Reģistrējieties, lai atbloķētu savas ekskluzīvās B2B cenas un sāktu iepirkties. Reģistrējieties tagad!
M-bus three-phase energy meter, MID approval image 1

M-bus three-phase energy meter, MID approval

Ir noliktavā: Nē Piegādātāja krājumi: Nē Minimālais pasūtījuma daudzums: 1
Cena (bez PVN):
199,59 €
Šī cena ir spēkā līdz 31.12.24
EAN: 4010312501726
MPN: 28380512
Iepakojums: 1

Technical Information

Preces stāvoklis Jauns
Ražotāja nosaukums M-bus three-phase energy meter, MID approval
Zīmols ELTAKO
Kategorijas Elektrības skaitītāji
Izcelsmes valsts CN
Harmonizētās sistēmas kods 9028 3019 00
Montāžas metode DRA (adapteris uz DIN sliedes)
Platums 70 mm
Augstums 82 mm
Dziļums 58 mm
Biežums 50 Hz
Maks. strāva (Imax) 80 A
Platums moduļu atstarpju skaitā 4
Aizsardzības pakāpe (IP) IP20
Pole tips Četru vadītāju
Nominālais spriegums (Un) NL 230 V
Nominālā strāva (in) 10 A

Iepakojuma informācija

Iepakojuma līmenis 1 4010312501726, 4010312501726
Iepakojuma līmenis 2 4010312501726

Citi tehniskie dati

Modelis Tiešie mērījumi
Piemērots Iegāde
Norādes veids Digitālais
Kopējais pozīciju skaits (skaitītājs) 7
Skaitītāja veids Elektroniskais
Interfeisa veids M-bus (vadu)
Enerģijas veids Efektīva jauda
Tarifa veids Divu tarifu
Tarifu kontrole Ārējais
Evakuācijas mehānisms Yes
Kalibrēts Yes
Apstiprinājums Mērinstrumentu direktīva
Precizitātes klase B
Mērījumu veida slodzes profils -
EEC40 paraksts -
Ar bloķēšanas kodu -
Nominālais spriegums (Un) LL 400 V

Lejupielādes

Apraksts

M-bus three-phase energy meter. Maximum current 3x80A. Standby loss 0.5 watt per path only. Modular device for DIN-EN 60715 TH35 rail mounting. 4 modules = 70mm wide and 58mm deep. Accuracy class B (1%). With M-bus interface. It measures active energy by means of the current between input and output. The internal power consumption of 0.5 watt active power per path is neither metered nor indicated. 1, 2 or 3 phase conductors with max. currents up to 80A can be connected. The inrush current is 4OmA. The N terminal must always be connected. The 7 segment LC display is also legible twice within a period of 2 weeks without power supply. Power consumption is indicated by an LED flashing at a rate of 1000 times per KWh. Designed as standard for using as double-tariff meter: Switch over to a second tariff by applying 230V to terminals E1/E2. On the right next to the display are the keys MODE and SELECT. Press them to scroll through the menu. First the background lighting switches on. The display then shows the total active energy per tariff, the active energy of the resettable memory RS1 or RS2 as well as the instantaneous values of ­consumption, voltage and current per phase. Error message (false): When the phase conductor is missing or the current direction is wrong false and the corresponding phase conductor are indicated on the display. M-bus data transfer: On read-out all values are transferred in a telegram. The following telegrams are supported: - Initialisation: SND_NKE, Reply: ACK. - Read out meter: REQ_UD2, Reply: RSP_UD. - Change primary address: SND_UD, Reply: ACK. - Reset RS1: SND_UD, Reply: ACK. - Slave selection for the secondary address Reply: ACK. The device does not reply to unknown requests: The transfer rate is detected automatically. The device has a voltage monitor. In case of voltage loss, all registers are saved in the EEPROM. Changing the M-bus primary address: To change the M-bus primary address, hold down SELECT for 3s. In the menu that appears, press MODE to increment the address by 10. Press SELECT to increment by 1. When the required primary address is set, wait until the main menu reappears. Secondary address: It is possible to communicate with the energy meters according to the standard EN13757 using the secondary address. The use of wild cards is possible. For details refer to the operating instructions at www.eltako.com.